tt post sep 9, 2015 about anthony wayne bridge project bq. _"Does anyone know who I could contact about the plans for reopening?"_ Maybe : q. Theresa Pollick, ODOT’s district spokesman in Bowling Green q.. We are located in "ODOT District 2.":http://www.dot.state.oh.us/districts/d02/Pages/default.aspx It might be possible to contact an ODOT person via their Facebook or Twitter pages: * https://www.facebook.com/ODOTD2 * https://twitter.com/odot_Toledo br. ODOT info: * "Anthony Wayne Bridge Project":http://www.dot.state.oh.us/districts/D02/High%20Level%20Bridge%20Project/Pages/AnthonyWayneBridgeProject.aspx ** "Work includes redecking the bridge, replacing the existing truss end spans, rehabilitation of the existing substructures, *new street lighting* and rebuilding the sidewalks, railings and fence." * "pdf file":http://www.dot.state.oh.us/districts/D02/High%20Level%20Bridge%20Project/Documents/AW%20Bridge.pdf ** "Replacing the bridge deck, sidewalks, railings, *lighting,* fencing and expansion joints." br. Sep 1, 2015 Blade story titled "Anthony Wayne Bridge’s overhaul nears the finish line":http://www.toledoblade.com/local/2015/09/02/A-W-Bridge-s-overhaul-nears-the-finish-line.html : q. *ODOT: Span 90% complete; agency eyes Nov. reopening* ... but there’s still much to be done before the Anthony Wayne Bridge reopens to traffic. A median wall must be built; railings, guardrails, safety fences, and *streetlights* must be installed, and a variety of other finishing touches need to be applied before the bridge, which closed on St. Patrick’s Day last year, is ready to go, project officials said during a media tour. q.. br. I assume that street lighting is different from the decorative bridge lighting.